2022
Aug. Introduced in-house system dispatcher (automatic allocation of testers)
th
2020
May: Started production of wafer level burn-in for automobiles
2019
September Final test production of UVC LED started
th
2017
June Start of direct shipment from our company to customer-designated bases (including overseas: specified consignor certification)
2016
February Established "Test Development Department" to strengthen test development work
March Started test development for in-vehicle control system products (A rank) (S100 tester)
2015
2014
Full-scale operation of EDICS, realizing paperless factory
April Production worker support system EDICS (STEP 1) operation started
th
2012
May Entered into a business partnership with Young Tek Electronics Corp (YTEC) in Taiwan
July: Dispatched two employees to Taiwan to attend YTEC tester training and introduced a tester (S100).
th th th
2011
Apr. Self-maintenance of probe card started.
Oct. Full cooperation in response to emergency alternative production support requests from 3 customers due to flooding in Thailand.
th
2009
Jan. In-house production of semiconductor equipment (handler)
Aug. Wafer level package turnkey service started
th
2007
Feb. Received the Green Partner Award at the 6th Ricoh Group Green Procurement Convention.
th
2004
January Build test mass production system for information security IC (entry/exit system, etc.)
July Logic_12 inch (300 mm) wafer test begins
August New factory F building (300 mm test line) completed
October Memory_12 inch (300 mm) wafer Test start
Dec. Acceptance of final test for analog products started
th
th
th
th
2003
June Received Sony Green Partner certification from Sony Corporation.
September: Begins regular contracted test design work from a certain company.
1999